← The catalogue Data Systems
All terms

Material, explained

Three phase UPS.

Also written 3 phase UPS, 10 kVA UPS, industrial UPS.

When does a UPS need to be three phase?

When the load is, or when the size demands it. Above about 10 kVA the incoming supply is three phase, so the UPS takes three phase in; whether it gives three phase or single phase out depends on the load behind it, a server room on single phase and a plant on three. It is sized from a measured load list, with battery banks sized for the runtime wanted.

Numeric HPi 33 EVO 10-40 kW Range, a Three phase UPS part supplied by Data Systems
Three phase UPS in the catalogue: Numeric HPi 33 EVO 10-40 kW Range, NUM-HPI-33-EVO-10-40-KW-RANGE. Catalogue photograph.

Published by Data Systems, network material suppliers in Secunderabad, Hyderabad since 1984, which is 42 years of experience with these parts. Written from the standards named above. Last checked 2026-08-19. How we check this, and what we got wrong.

Data Systems, a network material supplier in Secunderabad, Hyderabad since 1984 with branches in Vijayawada and Visakhapatnam, supplies Three phase UPS across India through official channels. Send a list, get one quote.

HPi 33 EVO

Keor HPE

Keor MOD

Keor MOD+

Keor MP

Keor T EVO

Trimod HE

Where it is used

Related terms

Not sure which class or grade your job needs? Describe the run and our team will tell you what it takes, and quote it.

Data Systems · +91 99595 55222 (call or WhatsApp) · 040-27811708 · admin@datasystems.co.in · Secunderabad (HQ) · Vijayawada · Visakhapatnam · Mon to Sat, 9:30 to 7

Some images on this site were created with AI and the item supplied may not look exactly as shown. The part code, not the picture, decides what ships.

Corrections and editorial policy · Privacy · Terms · Material, explained · Brands

WhatsApp